Not sure whether your lot allows a second storey?
Call us with your address and we will tell you what the zoning map shows before you commit to anything.
1 Davidson Rd, Aurora, ON L4G 2A9
Working Hrs : 8.00am to 9.00pm


28 October 2026
By : Home Best Solutions / 0 Comments
Home Best Solutions builds home additions across Toronto and York Region: second storey additions, rear and side extensions, above-garage rooms, in-law suites and ground floor accessible additions. We have been at it since 2017, with more than 200 completed projects behind us. Before you pay for drawings, we check what your zoning permits and whether the existing foundation can carry the new load. You deal directly with the owner, Reza Milani. He quotes the project and he is the one accountable for it, from the first site walk through to the final inspection.
Call us with your address and we will tell you what the zoning map shows before you commit to anything.
If your project is on this list, it qualifies.
Custom home builds are a different job with their own page, as are condo, commercial and deck work.
Send us photos of the side or rear of the house with a rough sketch of what you want, and we will tell you which type of addition the lot supports before we book the site visit.
The addition we quote most often in Toronto, and the one that raises the most foundation questions. We expose and assess the existing footings, coordinate the engineering through our partners, and build the new floor so the roofline and brick read as one house rather than a top-up. If the footings need strengthening, that underpinning or bench footing is built by licensed structural and foundation trades. We bring them in, schedule them, and stay accountable for the result. Suited to 1950s to 1980s bungalows and post-war 1.5 storey homes in Scarborough, North York, Etobicoke and York Region.
A ground floor addition for a parent who cannot manage stairs is part bedroom, part bathroom, and the bathroom is where most of it is won or lost. We build accessible work to CSA B651 guidance. That means wider doorways, clear floor space to turn a chair or a walker in, blocking behind the walls for grab bars, and a curbless shower sitting level with the bathroom floor. Schluter is our standard waterproofing system. Every waterproofed pan we build gets flood-tested before a single tile goes down. If the addition brings a new kitchen, laundry or fireplace with it, the gas line is run by licensed gas fitters on our schedule.
There is no single “city” in a GTA addition. Where the house sits decides which department reviews the drawings, which zoning by-law sets the limits, and which extra permits apply.
In Toronto, the application goes to Toronto Building and is reviewed against Zoning By-law 569-2013, which sets the lot coverage, building height and setbacks your addition has to stay inside. Most of that by-law is in force, though some regulations remain under appeal at the Ontario Land Tribunal and a small number of properties are still governed by the former municipal by-laws.
Many bungalow top-ups in older Scarborough, North York and Etobicoke subdivisions fit inside those limits. When one does not, the route is a minor variance through the Committee of Adjustment under section 45 of the Planning Act, which means an application, a hearing, and a decision before the building permit can be released.
Toronto layers on rules the York Region municipalities do not. A private tree of 30 centimetres or more in diameter, measured 1.4 metres above ground level, cannot be injured or removed without a permit under the Tree Protection By-law, and construction work that reaches into a protected tree’s protection zone counts as injury, which is why excavating near a mature maple needs an arborist assessment before we dig.
If the lot falls inside a protected ravine or natural feature, the Ravine and Natural Feature Protection By-law applies to trees of any size and to changes in topography and new structures, whatever the tree diameter.
In a Heritage Conservation District, a heritage permit can be required on top of the building permit, under the district plan adopted through Part V of the Ontario Heritage Act.
North of Steeles Avenue, each municipality runs its own department and its own sequence.
One thing we want clear before you sign anything. The architectural drawings, structural engineering, survey and permit application are prepared by trusted partners and subcontractors we have worked with for years. We do not stamp drawings. We coordinate the whole approvals package, answer the examiner’s comments, and keep the file moving so the crew is never waiting on paper.
Email it to us. Reza will read it and call you back with a plain answer on whether the project is buildable as drawn.
Two things worry homeowners most. One, that the house cannot carry the addition. Two, that a contractor opens the roof and then goes quiet. Engineering answers the first. The second is answered by how we are set up. Whoever quotes your addition is accountable for it through to final inspection, and our own supervision runs the trades day to day. You are not chasing a rotating cast for an answer.
Before a second storey goes on, the existing footings are exposed and checked against the new load. If they come up short, licensed structural and foundation trades build the new pad footings, underpinning or bench footing to the engineer’s design. We do not ask a sixty-year-old foundation to carry a new floor on faith. Load-bearing walls that come out for an open main floor are replaced with steel or LVL beams sized by the structural engineer, with temporary shoring in place during the swap. New floor and roof framing is tied into the existing structure at every bearing point, and the roof is sheathed and dried in before exterior finishes go on.
1.Site walk and feasibility. Reza checks the zoning map for your address, looks at the foundation, roof, and services, and sends a written summary of what is buildable.
2.Drawings and engineering. Our design and engineering partners produce the permit set. You approve the layout before anything is submitted.
3.Fixed scope and quote. You receive a line-item quote. Change orders are priced in writing and signed before the work happens.
4.Approvals. We coordinate the package to the right department, including any arborist, grading or heritage step, and book each inspection.
5.Build. Foundation, framing, roof, envelope, mechanical rough-ins, then finishes, with the licensed trades scheduled around each other so the site is not standing still.
6.Final walkthrough and closing inspection, with the deficiency list cleared before the last payment.
Most families stay in the house for a rear or side extension. A second storey is different: the ceiling comes off, so the main floor is exposed until the new roof is on. We tarp and temporary-frame the opening, seal the stair and work areas with poly and zipper doors, and run negative-air fans to keep dust out of the rooms you are still using. For a full second storey we tell you in the quote how long the house will not be livable, before you sign, and we schedule foundation and roof-opening work around the GTA construction season rather than opening a roof in the middle of winter.
Book the in-home consultation and we will walk the foundation and roof with you before you decide anything.
Home Best Solutions was founded in 2017 and is led by owner Reza Milani, who brings over 20 years of hands-on renovation and construction experience. He quotes the job, he signs off on it, and he is who you call. Nobody sits between you and the person accountable for your roof.
We hold a Building Renovator licence with the City of Toronto, carry liability insurance and WSIB coverage, and have a 5.0 rating on Google, HomeStars and Houzz. More than 200 completed projects sit behind that rating. Our barrier-free and curbless bathroom work, trusted by senior care providers and disability charities, carries straight into ground floor in-law suites: wider doorways, a curbless shower, and a main floor bedroom for a parent who cannot manage stairs.
Additions are quoted from the drawings, not from a square foot guess. We do not publish a rate per square foot for additions, because the foundation and the approvals move the number more than the floor area does. What drives it: underpinning or bench footing, the number of load-bearing walls coming out, roof shape, whether there is a bathroom or a kitchen in the new space, and whether a minor variance, tree permit, grading permit or heritage review applies.
The quote lists every line and is fixed once the scope is signed. Change orders are priced in writing and signed before that work starts, so the number you agree to is the number you track against.
We build additions in Scarborough, North York, Etobicoke and East York, and across Vaughan, Markham, Richmond Hill and Newmarket, working out of our Aurora office. Deciding between building up and building out? Call (647) 862-6050 and we will price both against your lot. The form below reaches Reza directly.
Yes. Every addition that adds floor area needs a building permit: from Toronto Building in Toronto, and from the local building department in Vaughan, Markham, Richmond Hill, or Newmarket. The extra steps differ by municipality. Vaughan requires the lot grading permit from Development Engineering before the building permit application; Richmond Hill requires a site alteration permit once the addition exceeds 400 square feet of footprint, and Markham takes every application through the ePLAN portal. We coordinate the application through our design partners and book every inspection.
Most 1950s to 1980s GTA bungalows can, once the footings are exposed and confirmed by the structural engineer. When they cannot, the engineer designs the underpinning or bench footing, licensed foundation trades build it, and the cost is in the quote before you commit. It is not a mid-build surprise.
Not while the roof is off and the new floor is framed and dried in. We give you that window in writing in the quote, once the drawings show what has to come apart. For rear and side extensions most families stay in the house, with the work area sealed off and negative-air fans running.
We do, through our design partners. A minor variance is an application to the Committee of Adjustment decided under section 45 of the Planning Act, and larger changes require a zoning by-law amendment instead. We prepare and coordinate the application, attend the hearing with you, and hold the permit submission until the decision is settled.
It depends on the municipality and the tree. In Toronto, a permit is required for a private tree 30 centimetres or more in diameter, measured 1.4 metres above ground, and construction inside that tree’s protection zone counts as injury even if the tree stays. In Vaughan, the threshold is 20 centimetres, through a Construction or Infill tree permit. We flag it at the site walk, before the drawings are drawn around a tree that cannot move.
We are the general contractor. The regulated work goes to the trades licensed to do it and we run the schedule around them. Gas lines for a new kitchen, laundry or fireplace: licensed gas fitters. Underpinning and bench footing: licensed structural and foundation trades, to the engineer’s design. If the addition includes a bathroom, we waterproof with Schluter and flood-test the pan before tile goes down.
Yes. It is one of the few things we would call a specialty. Accessible additions are built to CSA B651 guidance: wider doorways, clear turning space, grab bar blocking in the walls, and a curbless shower level with the floor. Senior care providers and disability charities send us this work.
Send the address, photos of the side or rear of the house, and a sketch or a wish list. We walk the site, confirm what the zoning allows, then quote from the drawings once the scope is set. Call (647) 862-6050 first and we will tell you whether the idea is buildable before anyone spends money on design.
