Second-Floor Bathroom with Structural Repair, Downtown Toronto

  • Project Type: Bathroom Renovation
  • Year: 2023
  • Contractor: Home Best Solutions
  • Location: Downtown Toronto (Dundas Area)
  • Unit Type: Townhouse
  • Details: Engineered Joist Repair, Floor-to-Ceiling Marble, Schluter Floor Heating, Toto Washlet, Imported French Tub and Shower

Mari and William were referred to us by our client Vince, who lives in the same downtown Toronto neighbourhood. They wanted to fully refresh the second-floor bathroom in their townhouse, keeping roughly the same layout but with everything new, including floor heating. The finishes were high-end: floor-to-ceiling marble tile, a Toto toilet with an electric washlet, and a bathtub and shower system imported from France.

The structural problem

Once we had demolished the room and started the plumbing rough-in, we found that a bathroom built there 25 years earlier had been done unsafely. The toilet drain ran through a large hole cut in a floor joist, and an electrician had notched the joists further. We brought in our structural engineer, who confirmed that the floor was compromised and could fail under load.

We told the clients. At first they weren’t worried, since it had been like that for 25 years, and they offered to sign a waiver releasing us from liability so we could carry on. After thinking it over and speaking with our lawyer and structural engineer, we went back and told them honestly that it wasn’t right to proceed, that a waiver wouldn’t be enough, and that their safety mattered. We said we wanted it fixed, and that if they preferred to hire someone else for the repair we would understand.

The next day Mari and William told us they trusted us and wanted us to fix it. Our structural engineer prepared a repair design, we removed the plumbing, installed sister joists following the engineer’s instructions, and had the repair re-inspected and approved. Only then did we install the new plumbing.

Winter marble work and a French bathtub

The project ran through a very cold winter, from late November through January. All the tile was marble, so we cut it with a wet saw in the garage, where temperatures dropped to around minus 20 and the water kept freezing. We warmed the setup so we could keep cutting cleanly. We again used Schluter with floor heating.

The French bathtub has no conventional overflow. Instead, a mechanical sensor on the drain opens and closes automatically at a set water level. The Toronto supplier had no installation specs, so we contacted the manufacturer in France directly for the proper instructions and installed it so it works perfectly.

The clients were extremely happy, and Mari said the result was beyond her expectations. The project was completed in 2023. They have since introduced us to other neighbours, and Mari left us a positive Google review.

Have A Question

  • What happens if you find structural damage during a bathroom renovation?

    We stop and bring in a structural engineer. In this Toronto townhouse, old work had cut and notched the floor joists. The engineer designed a repair, we sistered the joists, and the repair was inspected and approved before any new plumbing went in.

  • Can a homeowner sign a waiver so work continues over a damaged floor?

    On this project the clients offered to, but after speaking with our lawyer and engineer we declined. A waiver does not make the floor safe, so we recommended fixing it, and the clients agreed.

  • How do you install a bathtub that has no standard overflow?

    This French tub uses a mechanical sensor on the drain that opens and closes at a set water level. The local supplier had no specs, so we got the installation instructions directly from the manufacturer in France.