We handle home renovation in the GTA at whole-house scale: the interior gutted or reworked in a single project, with one schedule and one quote. Home Best Solutions plans the layout with our partner designers and engineers, handles the permit and inspection side, and runs every trade so the kitchen, bathrooms, basement, floors and finishes come together in the right order. We work in detached, semi-detached and townhouse homes across Toronto, North York, Scarborough and York Region, and you deal with the owner from the first walkthrough to the last deficiency.
We’ll walk it with you before anything is priced.
A complete home renovation with us, which some owners call a whole house renovation or a full home remodel, means most or all of the house is done as one job. Each part below has its own service page with the full detail. Here is how it fits into the whole.
Layout changes come first. For an open-concept main floor we take out the wall through load-bearing wall removal, with a beam and posts designed by a structural engineer and a building permit in place before the wall comes down.
The kitchen renovation usually moves when the walls do. We relocate drains, gas and electrical with the right licensed trades, then build the new layout once rough-ins pass inspection.
Bathroom renovations in a whole-house project are scheduled alongside the plumbing rough-in for every floor. Each waterproofed shower pan is flood-tested, and Schluter is our standard waterproofing system.
Basement finishing folds into the same permit and inspection schedule as the floors above, which saves a second round of mobilization.
New floors go in through our floor removal and installation service: engineered hardwood, solid hardwood, luxury vinyl plank, porcelain or ceramic tile, chosen per room.
A dated staircase is often the first thing people see. Stair renovation and refinishing covers treads, risers, and railings in wood, glass or metal.
Custom cabinetry and millwork ties the rooms together: built-ins, vanities, mudroom storage, trim and doors.
Interior painting and drywall closes up the walls after rough-ins and repairs lath and plaster where we keep it.
Popcorn ceiling removal starts with a test, because textured ceilings in older homes can contain asbestos. If the test comes back positive, a qualified abatement contractor removes it before our crews touch the ceiling.
Plumbing, electrical and HVAC upgrades run through licensed trades. Electrical goes through a Licensed Electrical Contractor, gas through licensed gas fitters, and underpinning, footings or other structural work through licensed structural and foundation trades.
Some projects belong on a different page. New living space is a separate decision, covered under home additions, in-law suite renovation, garden suites and custom home building. Condo suites are handled on our condo renovation page, and offices and clinics on commercial renovation. If only one room needs work, its own page is the better place to start. Our full list of house services sits under residential renovation.
Not sure if your list adds up to a full renovation or three separate jobs? We’ll tell you which way costs less.
Call us to talk through your scope:
Trades booked out of order cost money. Floors laid before the ceilings are scraped get covered in mud, and cabinets installed before the electrician finishes come back off the wall. On a whole-house job we set the sequence before demolition and hold every trade to it:
That order is the main thing you pay a general contractor for. Hiring trades room by room leaves you managing the gaps between them.
Open the walls of a pre-war or postwar house and you rarely find what the listing said. These are the conditions we plan for on every older home.
Knob-and-tube wiring was used in homes from the early 1900s to the 1940s, and many insurers will not issue or renew coverage while it’s in place. Our Licensed Electrical Contractor assesses it, and on a gut renovation we usually replace it while the walls are open. The same houses often have a small electrical service that can’t carry a modern kitchen, heat pump or EV charger, so the service upgrade goes into the scope and the ESA notification.
Toronto homes built before the mid-1950s may still have a lead water service pipe, and the private side is the owner’s cost to replace. If you commit to replacing your side, you can apply to have the City replace its side through the Priority Lead Water Service Replacement Program. We also find galvanized steel supply lines in older houses and price their replacement when the walls are open anyway.
Lath and plaster walls are repaired where they’re sound and replaced with drywall where they’re not.
Textured ceilings, old plaster and vermiculite attic insulation can contain asbestos. We arrange testing before demolition. Ontario’s O. Reg. 278/05 sets the procedures contractors and workers follow when asbestos-containing material may be disturbed. The homeowner is exempt from it, but the contractors and workers on a private home are not, so the rules apply to our site either way. Removal is done by a qualified abatement contractor, never by our general crews.
This is why every whole-house quote from us carries a contingency for hidden conditions. You see the amount up front, and any part of it we don’t use stays in your pocket.
Every GTA municipality runs its own building department, and the paperwork for a complete home renovation goes to whichever one covers your address.
In Toronto, removing walls or altering plumbing and mechanical systems needs a building permit from Toronto Building. Inspections are requested through the Toronto Building online portal, and inspectors attend Monday to Friday, 8:30 a.m. to 4:30 p.m. In Vaughan, permits go through the Building Standards department and inspections are booked by phone. Requests made before 4 p.m. are scheduled for the next business day. Markham’s Building Standards department takes inspection requests through its ePLAN portal. Richmond Hill’s Building Division has its own inspections line, and Newmarket’s Building Division takes permit applications through the Town’s online Development Portal. The Ontario Building Code gives the municipality 10 business days to review a complete permit application for a house.
Electrical work needs a separate notification to the ESA, filed by the Licensed Electrical Contractor doing the work. A building permit does not cover it.
Housing stock decides much of the scope:
Heritage conservation districts add a step for exterior work. In Toronto’s districts, additions and exterior alterations need a heritage permit, while interior changes and exterior work not visible from the street do not. In Newmarket, alterations to a property in the Lower Main Street South district need a heritage permit, and the Town asks owners to contact its heritage planning staff before making any changes.
Winter also shapes the schedule. New window and door openings and exterior wall work are planned for the warmer months, with interior trades running through the winter.
Send us your address and we’ll tell you what it will ask for.
Timelines depend on size. Permit review time sits before the start date, and drawings take longer when structural changes are involved.
Many owners stay put. We phase the work by floor or zone, seal the work area off from occupied rooms with dust barriers, protect the floors and stairs along the path in, and keep one bathroom working at all times.When the kitchen is being rebuilt, we can set up a temporary kitchen with a sink and power elsewhere in the house.
Moving out is the better call in three situations: a full gut where every floor is open at once, asbestos abatement in the living areas, or a stretch with no working kitchen or bathroom. Buyers who just closed on an older house have the easiest version of this, because doing the work before move-in shortens the schedule and avoids moving furniture twice.
You deal directly with the owner. The person who quotes your job is the person who stands behind it, and you have one point of contact through every stage. Behind that is a full team of trades, and we run several projects across the GTA at the same time.
The facts behind us: Reza Milani has more than 20 years of hands-on renovation experience. Home Best Solutions was founded in 2017 and has completed more than 200 projects. We hold a Building Renovator licence with the City of Toronto, no. T854882717, which you can check through the City of Toronto business licence lookup, and we carry WSIB coverage.
We are clear about what we do in-house and what we coordinate. Design, engineering and permit drawings come from our partner designers, architects and engineers. Electrical goes through a Licensed Electrical Contractor, gas through licensed gas fitters, structural and foundation work through licensed trades, and asbestos removal through a qualified abatement contractor.
If the renovation is meant to let you or a parent stay in the house for the long term, we build the accessible changes in while the walls are open: wider doorways, blocking for grab bars, a curbless shower, a main-floor bedroom or bathroom. Accessible work follows CSA B651 guidance. The federal Home Accessibility Tax Credit lets a homeowner who is 65 or older, or eligible for the Disability Tax Credit, claim up to $20,000 a year in qualifying expenses. Your accountant can confirm what counts.
Two recent whole-house jobs show the range: a Toronto bungalow with asbestos removal, a load-bearing wall out and a new kitchen, bathroom and basement, and a Richmond Hill townhouse with a new kitchen, rebuilt stairs and three bathrooms.
See the houses we’ve already taken apart and put back together, then call us about yours.
Call us about your house:
Our quotes are built from a defined scope. Everything we know we’re doing is listed and priced. Finishes you haven’t picked yet get an allowance per item, so you can trade up or down without reopening the whole quote, and the contingency for hidden conditions is a separate line.
What moves the cost:
Send them over and we’ll price the same scope line by line.
When most of the house needs to change, owners across Toronto and York Region call us in to run the whole job. We’ll walk it with you, tell you what the walls are likely to hide, and give you a written scope and quote.
Almost always. Removing walls, adding or moving plumbing, and changing HVAC systems all trigger a building permit from your municipality, and electrical work needs its own ESA notification. We coordinate the applications and book every inspection.
Often, yes. We phase the work by floor or zone, keep one bathroom working and can set up a temporary kitchen. For a full gut or asbestos abatement in living areas, we’ll recommend moving out for that stretch.
It depends on the size of the house, structural changes and permit timing. We give you a written schedule with the quote, and it accounts for permit review and inspection stages.
Every whole-house quote includes a stated contingency for hidden conditions such as knob-and-tube wiring, lead service pipes or asbestos. If we find something, we show you before any money from it is spent.
Our partner designers, architects and structural engineers prepare the drawings, beam designs and permit drawings, and we coordinate them through permit approval. You don’t have to hire or chase them yourself.
If the timing allows, yes. An empty house lets every trade work at once, and the electrical, plumbing and asbestos questions get answered before your furniture arrives. Call us after closing, or earlier if you want the house assessed before your conditions are waived.