Two Bathrooms, Then a Kitchen and Main Floor, Newmarket

  • Project Type: Bathroom and Kitchen Renovation
  • Year: 2023 to 2024
  • Contractor: Home Best Solutions
  • Location: Newmarket
  • Unit Type: House
  • Details: Two bathrooms, kitchen, floating shelves, flooring, staircase and railing, basement laundry, LVL attic joist repair, Ethernet wiring

Christine and Brian first hired us for two bathrooms in their Newmarket home. A few years later they came back for the kitchen and most of the main floor.

The bathrooms

In one bathroom a short wall left less room beside the toilet than the building code allows. We took that wall out and gained about 5 inches, enough to bring the clearance up to code. Between the toilet and the tub we used an L-shaped shower curtain that wraps around the corner.

They trusted us with a key and let us get on with the work. Brian left us a strong review when it was done.

The kitchen and main floor

The second project covered the kitchen, new flooring, the staircase and railing, a laundry area in the basement, paint, and Ethernet cable run from the router to the office and bedrooms.

Both of them are musicians who teach from home, so we planned the noisy work around their lessons. Partway through they went to the UK for a few months. They left us a key and signed cheques, and we kept going and sent updates.

What we found in the ceiling

The kitchen ceiling was sagging and had yellow stains. It looked like a leak, but when we opened it up the cause was a mouse infestation, and the staining came from droppings. We removed the old insulation and replaced it.

While the ceiling was open we also found a cracked joist in the attic. The attic load was sitting on a single 2×8. A structural engineer designed LVL replacements, and since the owners were away we sorted it out with them by phone and photos.

Finishing details

Between the upper cabinets we added floating shelves colour-matched to the cabinets. There are no visible brackets. They are fastened from inside the cabinets on each side. A new backsplash went in, the hardwood was forced tight and given extra nails so it stays quiet, and the stairs were rebuilt.

Christine and Brian have since sent us a lot of referrals.

Have A Question

  • Can you fix a bathroom where the toilet does not meet code clearance?

    Yes. Here a short wall left too little room beside the toilet. Removing it gave about 5 more inches, which brought the clearance up to code.

  • What if you find a structural problem during a renovation?

    We stop and bring in a structural engineer. In this house a cracked attic joist was carrying the load on a single 2x8, so the engineer designed LVL replacements before we closed the ceiling.

  • Can the work continue while we are away?

    It can. These clients spent a few months in the UK during the project. They left a key, and we kept them updated with photos and phone calls so decisions did not hold up the job.